Fluid Power and Controls

  • All people using the Fluid Power Laboratory must have completed the Fluid Power Laboratory Safety Course.
  • No equipment or instrumentation may be operated in the Fluid Power (1B19) or Controls (1B15) Lab with out the permission of the Departmental Assistant.
  • Emergency Response Plan.

Standard Operating Procedures (SOP)

  • Hard copies of all SOPs are located in room 1B19 (Yellow Binder) and these copies must be signed, digital copies are provided for reference only.
Hydraulic Power Supply Operation
Other Equipment

Departmental Assistant:

Doug Bitner
Office: 1B15.1
Phone: 966-5462
email: doug.bitner@usask.ca

Applicable Laboratories:

1B15
1B19